READINESS GATES

Readiness

Evidence-readiness gates and public-claim limits for SCC Air Quality reporting.

Current publication status

Source-collection integrity

Passed

Confirms current-data acquisition, provenance and quality-stage mechanics only.

Live SOS source coverage

Coverage Gap

107 of 129 governed PM sites represented through SOS; 82.9% against a 85.0% live-source threshold.

This governs the live/current SOS route only; it is not the England 30-day AURN review completeness metric.

Scientific episode release

Blocked

1 screening event(s); required missing dimensions: competing source assessment, regional model context.

Acquisition status distinguishes primary monitoring evidence from mandatory contextual sources. A degraded context harvest may support a clearly labelled data-availability release, but not an environmental episode, source, compliance, exposure or health finding. No England-wide current environmental assessment is published because the governed monitoring coverage and freshness gate was not met. Any internal screening signals remain withheld from an England-wide conclusion until the governed current-data coverage gate passes.

A green harvest gate is not a pollution-source finding. Source attribution, causation, permit breach, exposure and health conclusions remain prohibited unless the separate scientific gate passes.

Current release posture

All mandatory stream gates passed. The public site reports verified acquisition and readiness without converting incomplete data into scientific claims.

See current limitations and evidence joins

Readiness status

Overall status: api_led_screening_and_evidence_convergence_not_source_determination

Public claim level: Screening and readiness notes only

Readiness dashboard

Source acquiredComplete primary measurements
Provenance recordedComplete current measurement provenance
Parser validatedQuality validated current measurements
Time alignment checkedExecuted event time alignment
Monitor role checkedCandidate monitor roles unvalidated
Meteorology checkedSupplementary weather only official meteorology missing
Comparator checkedCandidate comparators executed monitor roles pending
Reviewer challenge recordedClaim framework started

Evidence checks

SCC Air Quality data table 1
Comparator Checkedcandidate_comparators_executed_monitor_roles_pending
Meteorology Checkedsupplementary_weather_only_official_meteorology_missing
Monitor Role Checkedcandidate_monitor_roles_unvalidated
Parser Validatedquality_validated_current_measurements
Provenance Recordedcomplete_current_measurement_provenance
Reviewer Challenge Recordedclaim_Framework started
Source Acquiredcomplete_primary_measurements
Time Alignment Checkedexecuted_event_time_alignment

Review requirement

A gate marked partial, context-only, needs-review, missing or not-ready must not be used as proof. It is a prompt for follow-up review and expert challenge.

How to read this page

Scientific evidence and software assurance are different

Scientific evidence

Measurements, station and regional coverage, descriptive calculations, source records and stated limitations are the evidence available for review.

Engineering assurance

Automated checks confirm that the pipeline followed its declared rules. They do not constitute peer review, accreditation, regulatory approval or institutional endorsement.