Short history and evidence boundary
SELCHP is configured in AQ26 as a priority energy from waste target in South East London.
The public dossier is built from strict target-specific terms including: SELCHP, South East London Combined Heat and Power. Generic acronyms are not accepted without a target anchor.
This page shows the current AQ26 public-safe evidence view. The most recent matched public-safe source update in this run is: 2026-05-02. Facility history remains evidence-led and should be read alongside original permits, inspections and reports.
Mapped location
The configured target point is shown on the AQ26 map with public-safe evidence links.
Associated public-safe reports, inspections and licences
Permits / licences
No public-safe records matched in this run.
Inspections / compliance
No public-safe records matched in this run.
Reports / assessments
- NP3738SY Veolia SELCHP Annual Performance Report 2019.xlsmreport · 2026-05-02
- NP3738SY Veolia SELCHP Annual Performance Report 2019.xlsmreport · 2026-05-02
- NP3738SY Veolia SELCHP Annaul Report 2021.pdfreport · 2026-05-02
- NP3738SY Veolia SELCHP Annaul Report 2021.pdfreport · 2026-05-02
- NP3738SY Veolia SELCHP EfW Annual Report 2022.xlsmreport · 2026-05-02
- NP3738SY Veolia SELCHP EfW Annual Report 2022.xlsmreport · 2026-05-02
- NP3738SY Veolia SELCHP EfW Annual Report 2023.xlsmreport · 2026-05-02
- NP3738SY Veolia SELCHP EfW Annual Report 2023.xlsmreport · 2026-05-02
Monitoring / data
No public-safe records matched in this run.
Other public-safe records
No public-safe records matched in this run.
Source-attribution caution
The automated site must not collapse these evidence classes into a single causal claim.